Since the ship was already bound to a schedule, an immediate repair could not be carried out. The ship’s owner then decided to continue as scheduled, but for the time being, to use a reduced engine output. In the meantime, it was decided to change the timetable and take the ship out of use for 14 days. After an inspection by our specialists, the Metalock Engineering Group was assigned the repair job and, in consultation with the owner and the classification society DNV, issued an expert opinion.