Mill table repair
The mill had not been refurbished before and the fretting corrosion was causing fixing bolts to shear due to substantial undesirable movement between the baseplate and the table.
Metalock Engineering Group was recommended by the mill’s chief mechanical engineer who had previous experience of working with the company when he was at the Llanwern steelworks in South Wales.
Metalock’s machine design comprised an outer support track, feed rack and feed assembly all of which was welded to the circumference of the 5.2m diameter base table after the baseplate segments had been removed. The assembly was aligned by laser and revolved around a main bearing hub located in a 640mm diameter hole in the centre of the table. A 3 metre long cross slide with its own feed and outer support mechanism, designed to rotate at 1 rpm, was attached to the hub. On the cross slide was an hydraulically driven milling head which enabled Metalock to remove material more quickly and provide a better finish than if a single point tool had been used.
Stainless steel segments
To replace the material that had been machined from the surface of the base table, Metalock produced twelve new 4mm thick stainless steel segments. These were predrilled to allow spotting through and subsequent drilling and tapping of 21 holes for M6 counter sunk screws to fix each segment.
The purpose of the stainless steel segments was so that, if necessary, they could be replaced in future rather than having to machine further material from the base table. Stainless steel was selected to better resist any future fretting corrosion. The fixing bolt configuration for the crusher track plate was also changed.
The baseplate was changed just over 12 months after the Metalock operation, and no marks on the main table indicated that the modification was successful.